Services
 |
|
 |
| |
Who is responsible for "dry" concrete?
How long does it take to "dry out" concrete?
Are the architect's specifications being followed?
Are the manufacturer's guidelines being followed?
Who will they call when the floor starts to buckle?
Who is going to pay for this problem?
We have the answer
to your questions. |
|
|
|
 |
|
 |
Vapor Emission Testing ASTM F 1869-04
Slab Humidity Testing ASTM F 2170
Existing floor covering removal
Portland cement overlays
Vapor Emission Control
Moisture Control
Shotblasting
Grinding
Scarifying
Your satisfaction is guaranteed!
No Need to Wait
With today’s fast track projects you will no longer have to wait for the slab to dry before you can install floor covering. If the floor you presently have already has a problem, it can be resolved within 4 hours.
Concrete Moisture Control Inc specializes in preventing or resolving moisture-related flooring problems. On new construction we can treat a one (1) day-old slab and have it ready for floor covering the next day. On existing projects we can remediate a problem and be ready for floor covering in as little as four (4) hours.
We at CMCI look forward to being a part of your solution…
It is never too early to call us. It is never to late to call us. 1-866-404-CMCI (2624)